Typical Cases
 
 
 
Products
 

Using place
Xinwen Mining Group Dragon Energy Limited Longgu mine
Xinwen Mining Group in Inner Mongolia Energy Great Wall Mine
Xinwen Mining Group Huaheng mining companies
Kailuan (Group) Co., Ltd. Donghuantuo mine
Heilongjiang Long Coal Mine Group Hegang branch Jude coal
 
Roadway and geological conditions
 
■Full rock Roadway, rock hardness of f8 ~ f10, some parts can reach to f13
■Hard rock texture, closely arranged, no stratification
 
Roadway section and support form
 
■Xinwen Mining Group Dragon Energy Limited Longgu mine  section size(W×H)5.7m×4.95m
■ Xinwen Mining Group in Inner Mongolia Energy Great Wall Mine(W×H)5.2m×4.8m
■Xinwen Mining Group Huaheng mining companies section size 5.0m×4.8m
■Kailuan (Group) Co., Ltd. Donghuantuo mine   section size  W×H)4.8m×3.7m
■Heilongjiang Long Coal Mine Group Hegang branch Jude coal section size(W×H)5.0m×4.0m
■ support: bolting

Testimonials
 
■Longgu mine of Xinwen Mining Group Dragon Energy Limited has been using the EBH300 (A) cantilever road header so far, the best daily tunneling distance is 5.5 meters, the best month tunneling distance is 165 meters. The road header is always operated by remote controller, convenient and flexible; good hard - rock cutting ability, high efficiency, low consumption of pick; high loading efficiency, big power; high reliability of hydraulic and electrical components. It is superior performance, safety and reliability, and has reached the international advanced level, can meet all requirements of the rock tunneling, and can replace similar imported models.

■ The EBH300 (A) was put into use in Kailuan Group Donghuantuo mine in September 2011 and has been working so far, the first month of use created a new record of full rock tunnel boring. Roadway section is the semi-arched cross-section area of 20 square meters, daily cutting 9-9.6 m, the full month of 22 days, cutting distance reached 200.2 meters. The cutting stable, high efficiency, small cut picks consumption. Separate loading and delivering electric driving systems made it more adapted to rock roadway. It was equipped with imported advanced centralized lubrication system to ensure that all parts worked normally and reliably, at the same time, improve maintenance efficiency, reduce labor intensity.

 
 
Copyright:Shijiazhuang Coal Mining Machinery Co., Ltd. ICP:09037270
Design by:http://www.sjznet.net
    <span id="13evs"><nav id="13evs"></nav></span>

    <input id="13evs"></input>
      1. <input id="13evs"></input>
        <i id="13evs"><del id="13evs"></del></i>
        <bdo id="13evs"><del id="13evs"></del></bdo>
        主站蜘蛛池模板: 宁化县| 绥棱县| 盐山县| 古丈县| 灵丘县| 太康县| 定兴县| 崇礼县| 沽源县| 海兴县| 塘沽区| 临城县| 阿图什市| 嘉黎县| 衡南县| 凤山县| 漯河市| 乐陵市| 娄烦县| 大方县| 济宁市| 新余市| 台东县| 肥城市| 甘德县| 镇江市| 当雄县| 哈巴河县| 泸州市| 永年县| 紫阳县| 湖州市| 嘉黎县| 开鲁县| 正蓝旗| 淄博市| 渭南市| 石屏县| 霍城县| 临漳县| 桃园县|